Education:
|
|
2001
– 2004
|
CANDIDATE
OF TECHNICAL SCIENCES (Ph.D)
Moscow Power Engineering Institute (Technical
University)
(http://www.mpei.ru/)
Power
Stations Department (http://es.mpei.ac.ru/),
post-graduate course
The
subject of my Ph.D thesis is “The influence of
electric arc on infeed from asynchronous motors
during the short-circuit in the a.c. installations with voltage below 1kV”. The result
of my research is the new principles of calculation the short-current in
installations with the asynchronous motors. I’ve developed the mathematical
model of electrical installation with the motor. The model based on the
Gorky-Park’s simultaneous differential equations and was actualized in
MATLAB software. With the model I’ve investigated the theoretical part or
my research. Also I’ve carried out the experiment with the active
electrical installation with the async. motor. The practical part of my research based on the
results of this experiment.
|
1995 – 2001
|
ENGINEER-ELECTRICIAN
DIPLOMA (Dipl. El.-Ing.)
Moscow
Power Engineering Institute (Technical University)
Power
Stations Department
The main courses were: the electrical
equipment of power stations, the calculation of short-circuit current,
designing of electrical part of power stations and substations and
others
|
Experience:
|
|
from 2003
|
APPRAISAL
ENGINEER, PROJECT MANAGER
“Energon” company (http://www.energon.ru),
Project Department
COMPANY’S
DESCRIPTION: power equipment suppliers for DC electrical installation
(accumulator batteries, chargers, switchboards, invertors, DC
motors)
FUNCTIONS:
project examination of electrical part, customers advisor, electrical
installations designer, project management (assembling, dismantling etc),
putting the installation into operation.
CUSTOMERS:
RAO EES Rossii (Orenburgenergo, Astrakhanenergo, Nijnovenergo), GAZPROM (Mostransgaz, Orenburggazprom, Urengoigazprom, Yugtransgaz,
Uraltransgaz, Yamalgazinvest, Gazcomplektimpex), Russian Railways (Moscow
Railways, Far-East Railways)
|
2001
– 2003
|
CHIEF
TECHNOLOGIST
“Modus”
company
FUNCTIONS:
working out the simulators of electrical installations for personnel
training
CUSTOMERS:
Power Stations of Moscow Power System (#8, #12, #17, #20, #25),
Nijegorodskaya and Voljskaya Hydroelectric Power Stations, the Hanty-Mansyisk Distribution
Network
|
2001 –
2003 гг
|
RESEARCH
ASSISTANT
Moscow
Power Engineering Institute (Technical University)
Power
Stations Department
FUNCTIONS:
assistance in department’s scientific researches. Have designed the
electrical part of Anadyr Wind Plant. Working
out the power equipment database in MS Visual Basic
|
2000 – 2001 гг
|
ELECTRICAL
ENGINEER
“VEPR”
company (http://www.vepr.ru/)
FUNCTIONS:
designing the diesel getsets’ electrical
circuits, designing of the off-line distribution network. Project
feasibility study. The gensets’ capacity I
worked with is up to 150kW
|
Languages:
|
Russian
(fluent), English (speaking)
|
PC:
|
MS
DOS, MS Windows, MS Office, MS Access, MS Visual Basic, Fortran, Adobe
AutoCad, Mathsoft
MathCad, Mathworks
MathLab, Adobe Photoshop
|
Sport:
|
Swimming,
Skiing, Ping-pong, Tennis
|
|